Latest
Tech News

Tesla Plans €3 Billion German Factory Expansion for Cybercabs

Tesla targets 2029 production at Grünheide, subject to a building permit. The planned capacity is not a production guarantee.

Read the story
Tech News · Read the story
Conceptual illustration of a gold driverless-style car in a factory beside the headline Tesla Plans Germany Cybercabs: €3 Billion Expansion.
Conceptual editorial illustration · not an actual Tesla factory or vehicle
Share this story

A new hall for Tesla’s robotaxi

November 17, 2026, 05:58 UTC.

Tesla plans to invest €3 billion in expanding its factory at Grünheide, southeast of Berlin, with a new building intended to produce its Cybercab. The company is targeting a 2029 start for production, Reuters reported Monday.

Tesla told Reuters the proposed facility is designed for up to one million Cybercabs a year. That is a planned capacity, not a promise that a million vehicles will be built or sold. Tesla says it intends to submit a building permit application by the end of 2026; construction is targeted for the first half of 2027.

The investment is about $3.3 billion at the exchange rate used by Reuters. The reported spending covers more than a single assembly hall: German broadcaster RBB reported that ancillary buildings and an additional wastewater treatment plant are also planned.

A target, with permits still ahead

The announced dates depend on a project that has yet to receive the new building permit. Reuters reported that Tesla expects to hire several hundred people for the initial construction and production planning phase; the eventual number of long-term manufacturing jobs is not established.

RBB reported that the Cybercab does not yet have approval in Germany or the European Union. Factory construction, production capacity and permission to operate an autonomous vehicle on public roads are separate questions. Tesla’s schedule is a company target, not proof of regulatory approval or completed construction.

Why this matters to Musk’s plans

The proposal adds a European manufacturing target to the company’s push into vehicles designed for autonomous driving. Tesla chief executive Elon Musk has said the company will wind down Cybertruck production at its Texas plant at the end of summer 2027 to free capacity for Cybercabs, Reuters reported.

In the United States, Tesla has invited selected customers to order the Cybercab for personal use. Newstro’s earlier report explains the proposed subscription, geofenced operating areas and restrictions. An invitation to order is not a completed delivery.

Local residents and environmental groups have raised concerns about water use at Grünheide. RBB reported that factory director André Thierig said the expansion could remain within contracted water allocations. Those are competing positions; the precise impact of the proposed development has yet to be established through the permitting process.

Where the project is planned

Tesla’s existing Berlin-Brandenburg factory is in Grünheide, east of Berlin. The star marks the approximate existing factory area; it does not identify the new building’s precise footprint.

Map data © OpenStreetMap contributors, ODbL. Factory location: Tesla; coordinates approximate.

The timeline

March 2022: Tesla opened the Grünheide factory, Reuters reported.

November 16, 2026: Tesla announced the proposed €3 billion expansion, according to Reuters.

By the end of 2026: Tesla plans to submit an application for the new building.

2027 and 2029: The company targets construction in the first half of 2027 and production beginning in 2029. Both are plans, not completed milestones.

Sources and visual credits

Reporting: Reuters, RBB and Tesla’s location information. The thumbnail and hero are conceptual illustrations of a generic vehicle factory, not photographs of Tesla’s plant or a proposed building.